This guide explains a typical kitchen renovation and the official rules that apply in Geelong. It is not legal advice. Follow the links, and ask the renovator to confirm what's needed for your home.
1. Brief and budget
Decide what's wrong with the current kitchen, what you want to keep, and your budget, including a contingency. Collect photos of kitchens you like.
2. Measure, design and quote
The renovator measures up, talks through layout and materials, and prepares a design and a written quote. Check what's included: demolition, plumbing, electrical, splashback, flooring, painting, appliances and rubbish removal.
3. Approvals and contract
In Victoria, a renovation that changes structure, such as removing a load-bearing wall, usually needs a building permit from a registered building surveyor. Plumbing and electrical work must be done by licensed or registered practitioners. Homes covered by a heritage overlay may need a planning permit for external changes.
Source: BPC, Protect your build.
In Victoria, domestic building work over $10,000 must be done by a registered builder under a written major domestic building contract. For work over $16,000, the builder must give you a domestic building insurance policy and certificate of currency before taking any payment. The deposit can be no more than 10% if the contract price is under $20,000, or 5% if it is $20,000 or more. Victoria's building regulator is now the Building and Plumbing Commission (BPC), which replaced the VBA, and you can check a builder's registration with it.
Sources: Consumer Affairs Victoria, What work requires a building contract; Consumer Affairs Victoria, Deposits and payments; Consumer Affairs Victoria, Domestic building insurance.
4. Demolition and rough-in
The old kitchen comes out, then the plumber and electrician run new services before walls are patched. Homes built before about 1990 may contain asbestos, which must be handled safely by people qualified to do it.
5. Installation and finishing
Cabinets, benchtops, splashback, appliances, tapware and lighting go in, followed by final connections and finishing. Expect to be without a working kitchen for part of the job, so ask for a timeline.
6. Handover
Walk through the finished kitchen with the renovator, note any defects in writing, and keep the compliance certificates for plumbing and electrical work and any warranty documents.
Official pages checked 23 November 2026. Rules can change; check the linked sources before relying on this summary.
See the main kitchen renovations Geelong page for how the quote service works, or request a free quote.